We were quite surprised to see how much progress was made since Thursday afternoon. A little less than half of the foundation was stacked with concrete blocks. I think they will finish this step tomorrow, and hopefully pour the concrete on Monday. Our builder says that it will be roughly 90 days from the time the concrete is poured until completion (weather pending).
This picture (above) is taken in the area that will be the Master Bedroom.
This is a side angle of the dining room .
The front of the house, taken from the road.