The past two days have been very productive! The Hardi Siding and Hardi Shakes are in the process of being applied to the house. The color of the siding (called Timberbark) looks fantastic with the rock and brick. The exterior is really coming together well. The Hardi Shakes will go on the two sections on the front, and the flat Hardi Siding with go on the sides and back. The flat siding come pre-painted, which makes the color last longer without fading. The shakes will be painted once the installation process is completed.
The right side of the house has all of the siding completed. The left side lacks a small amount at the top.
Front view of the house
The shakes have been applied to the top section on the front of the house. The lower section should be finished tomorrow.
The workers finally got started on the drywall today. They started with the upstairs. The upstairs bedrooms, bonus room, and the jack & jill bath all have the drywall hung.
The bonus room
One of the upstairs bedrooms
Jack & Jill bathroom upstairs
No comments:
Post a Comment