Tuesday, June 1, 2010

Duct Work and Plumbing

Although it was a rainy day, the crew was hard at work. The duct work and plumbing were started, and almost completed. We are so glad the roof has been completed, so that the workers can still get things done despite ugly weather!


This is a picture of the duct work above the master bedroom. It was taken from inside the walk out storage area.

This is another angle of the duct work above the master bedroom. The picture is taken from the great room.

The plumbing was completed in the kitchen and keeping room.

This is the plumbing in the keeping room and laundry room

We were surprised to see our bath tubs sitting inside the garage. The upstairs bath/shower was delivered, along with out master bathroom whirlpool.

Our temporary front door was delivered, along with our back door. It looks like the windows will be going in soon!

No comments:

Post a Comment