Saturday, June 5, 2010

Interior Details

We met with our designer this past week, and decided on several of the major interior details. This picture is a huge compilation of just a FEW of the decisions we have made. I believe we will be using a lot of different textures pared with warm earth tones. I can't wait to see how it will all look together!


Finally, the "Pratt Wrap" has been completed on the front, sides, and back of the house.

The whirlpool tub was delivered and installed. Isn't that a great view to see from the bathtub! Maybe it will be a while before we have neighbors building next to us.

The carpenters completed their work this past week. They finished framing the upstairs bedrooms, closets, and bonus room. We were also excited to see the arches made into the doorways going from the kitchen to the great room. I think it is a nice decorative touch.

The back door was installed.

The front (temporary) door was installed, along with the sidelights.

The gas fireplace was also delivered.

No comments:

Post a Comment